News Flash

Draper News

Posted on: November 4, 2022

Jordan River Trail Pipeline Rehabilitation

Construction Alert Template

SVSD MapSouth Valley Sewer District (District) is cleaning and repairing various segments of aging sewer infrastructure in Riverton and South Jordan. The District has found that these sewer pipes are in poor condition and in need of repairs to prevent additional deterioration and operational impacts. This project is using innovative technology to install a liner inside the existing pipe. This installation will take place while the old sewer line is still in service, which will minimize the impact to the public. Liner installation and re-establishing customer service connections may require some minimal excavation work. 

Crews will be conducting sewer pipeline rehabilitation along the Jordan River Trail between in the section of trail between 12300 South and Bangerter Highway beginning as early as November 7, 2022. Construction will occur off the trail and will require the shoulder on the west side of the trail to be closed. This work will occur between 7:00 am - 7:00 pm, including work on weekends. 

See full details here.

Facebook Twitter Email

Other News in Draper News

utah-wellbeing-logo

Draper Wellbeing Survey Results

Posted on: November 18, 2022
Draper Forward

Draper Forward - November/December 2022

Posted on: November 4, 2022
Public Works

Annual Bagged Leaf Collection

Posted on: October 17, 2022